Download Low Resolution
Download High Resolution
On to our next project: a steamer trunk. This project was built and filmed in an effort to assist my new friend, Duane. The video gives the whole story. And here is a forum thread about the project: Wood Whisperer Forum
This first part focuses on building the frames that make up the sides of the trunk case. I cover numerous topics, but I spend a significant amount of time on grain matching. And since I don’t work with plans on the show very often, I thought it would be good to review some tips, tricks, and overall strategy for working with plans. I am incorporating a few notable changes to the original plan. First is the joinery of the corner “legs”. I will be using a rabbet instead of a reinforced miter. The second, and most dramatic change is the top. The plan calls for an arched top, and I have opted for a square top.
For the Sketchup File of the new revised top, click here. For a PDF version of the new top, click here.
And if you would like to donate to the cause, please check out the following links:
American Cancer Society
James Cancer Center
If you are interested in Lee Valley’s side rabbet plane, check this out.
![]() |
Steamer Trunk Plan and Hardware This plan shows you how to build your very own classic trunk… |
Related Posts
- March 5, 2009 — 83 – Duane’s Steamer Trunk Pt. 2
- July 5, 2007 — 20- One Small Step
- May 15, 2007 — Finishing Quartersawn White Oak- Question of the Week
